ALANGHSE SERVICES |
VESSEL PULLING PERMIT | ALANGHSE-F-06 REV. 01 Controlled Form |
| SECTION 1: REQUISITION | |||
| Date: | 2026-08-10 | Issue Time: | 08:00 AM |
| Valid up to: | 08:00 AM | Permit No. A/B | [ VP_PERMIT_NO ] |
| Applicant Name (Mukadam): - | VISHAL PANDEY | Ship Name: - | VISHAL PANDEY |
| Name of Workers / कार्यकर्ताओं के नाम | VISHAL PANDEY | ||
| Winch numbers, used for pulling operation (चरखी नंबर) | [ VP_WINCH_NOS ] | JHA Report No./ जे एच ए नं. (If any) | [ VP_JHA_NO ] |
| SECTION 2: WORK SITE PREPARATION / PRECAUTIONS SPLIT CHECKLIST | |||||||
| CRITERIA | Y | N | N/A | CRITERIA | Y | N | N/A |
Initial meeting: Is vessel pulling plan discussed with General Manager, Mukadams, HSE team and crane operator at least one day in advance? |
☑ |
13. Are all personnel in pulling activity wearing the appropriate PPE? |
☑ |
||||
2. Are tide-tables available with Mukadam, winch operator and HSE? Expected date and time of operation ________ |
☑ |
14. Is the winch operation tested prior to the pulling operation? Has the RPM meter been tested? |
☑ |
||||
3. Has the good weather prediction checked? |
☑ |
15. Is the winch area door locked? |
☑ |
||||
4. In case of low light condition, sufficient lights have been arranged? |
☑ |
16. Is any oil leakage visible near winches? |
☑ |
||||
5. Is “Emergency signal to stop operations” explained to winch operators? |
☑ |
17. Is the intertidal zone kept clear of any obstacles? |
☑ |
||||
6. Are effective means of primary & secondary communication equipment agreed and tested? |
☑ |
18. Are only designated competent & trained persons operating winch? |
☑ |
||||
7. Are HSE team member and supervisor clearly identified to lead this operation? HSE: _________ Supervisor: _________ |
☑ |
19. Is the area clear and all ongoing work stopped on-board, inter-tidal area and near winches before vessel pulling? |
☑ |
||||
8. Are Winches, Wire ropes, kappa (sheave block) and chains in good condition with 6-monthly valid certificates? |
☑ |
20. Are all workers briefed on safety rules, emergency signals, and safe operation during vessel pulling? |
☑ |
||||
9. Are last scheduled preventive maintenance inspection for winches, wire ropes and kappa carried out? |
☑ |
21. Barricaded the area near the winches and display the sign “Danger, Stay Away” and “Authorized person only” |
☑ |
||||
10. Is “Safety Notification Form” to inform neighbouring yards given? |
☑ |
22. Confirm both sides (port/stbd) of vessel are connected with sheave blocks prior to commencement of pulling operation. |
☑ |
||||
11. Are double bottom block lightening holes and manholes sealed? |
☑ |
23. Is outdoor illumination >= 60 lux, in case of natural low light condition? |
☑ |
||||
12. Pre-job Meeting done before the vessel pulling operation |
☑ |
24. Is yard Management Representative/General Manager present onsite prior to vessel pulling operation? |
☑ |
||||
| SECTION 3: PERSONAL PROTECTIVE EQUIPMENT (PLEASE TICK WHERE APPLICABLE) | ||||
☑ Safety Helmet/ हेलमेट |
☑ Safety Goggles/ सेफ्टी चश्मा |
☑ Cut resistant gloves |
☑ Safety Shoes/ सेफ्टी जूता |
☑ Cotton gloves/ सूती मोजा |
☑ Ear plug/ईयर प्लग |
☑ Ear muff/कान मफ |
☑ Coveralls/ड्रेस |
||
| SECTION 4: EMERGENCY ITEMS (PLEASE TICK WHERE APPLICABLE) | ||||
☑ Life jacket/ लाइफ जैकेट |
☑ Fire Extinguisher/ फायर बाटला |
☑ First Aid Box |
☑ Fire Hose Standby |
☑ Life buoy/ लाइफबॉय |
☑ Fire pump ready |
☑ Sand bucket/ रेत की बाल्टी |
☑ Stretcher/स्ट्रेचर |
☑ Other/अन्य _________ |
|
| SECTION 7: JOINT INSPECTION - APPROVAL SEQUENCE | ||
|
A. PERMIT APPLICANT
I am satisfied that all precaution has been taken and all safety arrangements will be maintained for entire duration of work.
Name: VISHAL PANDEYDesignation: Ship Supervisor / Yard Supervisor Signature |
B. HSE APPROVAL
I am satisfied with safety precautions and hereby give permission to commence work.
Name: VISHAL PANDEYDesignation: Safety Officer / HSE Manager Signature |
C. PERMIT CONTROLLER / PM-GM
Approval by Plot Manager (PM) / General Manager (GM). Name: VISHAL PANDEY Designation: PM/GM Signature |
| SECTION 6: SPECIAL INSTRUCTION/कुछ जरुरी सुचना जो मूकादम को परमिट लेने से पहले जानकारी लेना जरुरी हैI |
|
1. नियर मिस कभी भी छुपाने की कोसिस न करे, उसे फौरन सेफ्टी ऑफिसर/HSE प्रबंधकको रिपोर्ट करे 2. काम समाप्त होने के तुरंत बाद परमिट सेफ्टीऑफ़िसर/HSE प्रबंधक को लौटा दे! 3. परमिट मे जिस स्थान और जहाज की परमिट दी गयी है उसके अलावा किसी अन्य जगह पर काम न करे मैं VISHAL PANDEY ऊपर दिए गये सभी निर्देसो को सही से पढ़ और समझ लिया हैतथाकाम में लगे सभी कार्यकर्ताओं को भी समझाया गया है पूरी काम समाप्त होने तक इस ऊपर लिखे निर्देसो का सही से पालन करूँगा | मूकादम का हस्ताक्षर: _________________________ दिनांक: 2026-08-10 |
| SECTION 7: PERMIT RETURN (PLEASE TICK WHERE APPLICABLE) | |||||
| ✓/X | STATUS | PERSON | NAME | SIGNATURE | TIME |
☑ |
Permit is closed, job is contd. Please issue new permit | Mukadam | VISHAL PANDEY | 08:00 AM | |
| Safety Officer | VISHAL PANDEY | ||||
☑ |
Permit is closed, job is completed | Mukadam | VISHAL PANDEY | ||
| Safety Officer | VISHAL PANDEY | ||||
☑ |
Permit is cancelled, as present conditions are not conductive for carrying out the work | ||||
| SECTION 10: EMERGENCY CONTACT NUMBERS | |||
| SL. NO. | NAME | DESIGNATION | CONTACT NO. |
| 1 | ROCKY SINGH | HSE MANAGER | 7990404108 |
| 2 | PRAVIN SHIYAL | PLOT MANAGER | 79846 07070 |