Logo
ALANGHSE SERVICES
BOAT EMBARKATION PERMIT ALANGHSE-F-07
REV. 01
Controlled Form
SECTION 1: REQUISITION / CONTROL INFORMATION
Applicant (Mukadam)VISHAL PANDEY Ship NameVISHAL PANDEY
Loc of Embarkation[ BE_LOC_EMB ] Loc of Disembark[ BE_LOC_DISEMB ]
Workers / PassengersVISHAL PANDEY
Date / Issue Time2026-08-10 / 08:00 AM Valid up to / Permit No.08:00 AM / [ BE_PERMIT_NO ] A/B
SECTION 2: COMPLIANCE MATRIX
CHECK / CRITERIAYESNON/AREMARKS
PRE-RIDE PLANNING & COMMUNICATION
1. Boat ride plan discussed with GM/HSE/Mukadam?
[ Q1_RMK ]
2. Required to notify Marine Police about ride?
[ Q2_RMK ]
3. Tide-tables available with Mukadam & operator?
[ Q4_RMK ]
4. Primary/secondary comms tested (Walkie/Mobile)?
[ Q5_RMK ]
5. Wind speed, sea state, forecast checked?
[ Q6_RMK ]
6. Timing of return ride informed to all personnel?
[ Q26_RMK ]
SITE CLEARANCE & ACCESS
7. Clean landing area identified on both sides?
[ Q7_RMK ]
8. Embarkation zone kept clear of obstacles?
[ Q8_RMK ]
9. Inter-tidal area clear & ongoing work stopped?
[ Q9_RMK ]
10. Is proper access ladder provided to board the boat and the ship?
[ Q15_RMK ]
11. Permit displayed near the Embarkation point?
[ Q27_RMK ]
BOAT CONDITION & LOAD CONTROLS
12. Are all the moving parts of the boat secured?
[ Q16_RMK ]
13. Is the fuel and lube oil check has been carried out?
[ Q17_RMK ]
14. Is any oil leakage visible in the boat?
[ Q18_RMK ]
15. Max occupancy of the boat not crossed?
[ Q21_RMK ]
16. Passengers in designated space for balance?
[ Q22_RMK ]
PASSENGER SAFETY & AUTHORIZATION
17. HSE team member & supervisor clearly identified?
[ Q3_RMK ]
18. Personnel having 2 ID cards, stand at embark pt?
[ Q10_RMK ]
19. Security available on both sides for head counting?
[ Q11_RMK ]
20. Rescue boat equipped with Life Saving Appliances/Crane?
[ Q12_RMK ]
21. De-briefing done before boat ride operation?
[ Q13_RMK ]
22. Passengers briefed on safety, smoking ban, balance?
[ Q14_RMK ]
23. Are all personnel in boat wearing life jacket?
[ Q19_RMK ]
24. Emergency contacts placed in boat & Embark Points?
[ Q20_RMK ]
25. Waterproof bags provided for carrying belongings?
[ Q23_RMK ]
26. Trained First aider available in boat with first aid kit?
[ Q24_RMK ]
27. Food and water arranged for all onboard?
[ Q25_RMK ]
SECTION 3: PPE + SECTION 4: EMERGENCY READINESS
Spare Life jacket
Life buoy
First Aid Box
Safety Helmet
Safety Goggles
Safety Shoes
Cotton gloves
Ear plug
Coveralls
Rope
Pair of Oars
Fire Extinguisher
Rescue boat
Crane
Dust mask
SECTION 7: JOINT INSPECTION & AUTHORISATION MATRIX
A. PERMIT APPLICANT B. HSE APPROVAL C. PERMIT CONTROLLER / PM-GM
I am satisfied that all precaution has been taken and all safety arrangements will be maintained for entire duration of work.
Name: VISHAL PANDEY
Designation: Ship / Yard Supervisor
Signature:
I am satisfied with safety precautions and hereby give permission to commence work.
Name: VISHAL PANDEY
Designation: Safety Officer / HSE Manager
Signature:
Approval by Plot Manager (PM) / General Manager (GM).
Name: VISHAL PANDEY
Designation: PM/GM
Signature:
SECTION 6: SPECIAL INSTRUCTIONS / ACKNOWLEDGEMENT
1. नियर मिस कभी भी छुपाने की कोसिस न करे, उसे फौरन सेफ्टी ऑफिसर/HSE प्रबंधक को रिपोर्ट करे
2. जहाज से वापिस आने के तुरंत बाद परमिट सेफ्टी ऑफिसर/HSE प्रबंधक को लौटा दे!
3. यदि कोई उचित तर्क के साथ असुरक्षित महसूस करता है तो यात्रा रद्द कर दें

I have read and understood all instructions above and have explained them to all workers engaged in the work. I will ensure compliance until the work is completed.

Mukadam Signature: _____________________     Date: 2026-08-10
SECTION 7: PERMIT RETURN
✓/XSTATUSPERSONNAMESIGNATURETIME
Permit is closed, ride is completed MukadamVISHAL PANDEY 08:00 AM
Safety OfficerVISHAL PANDEY
SECTION 10: EMERGENCY CONTACT NUMBERS
SL. NO.DESIGNATIONNAMECONTACT NO.
1 HSE MANAGER ROCKY SINGH 7990404108
2 PLOT MANAGER PRAVIN SHIYAL 79846 07070