ALANGHSE SERVICES |
COLD WORK PERMIT | ALANGHSE-F-04 REV. 01 Controlled Form |
| SECTION 1: REQUISITION / CONTROL INFORMATION | |||
| Applicant (Mukadam) | VISHAL PANDEY | Ship Name | VISHAL PANDEY |
| Location / Work Description | [ CW_LOCATION ] - [ CW_DESC ] | ||
| Date / Issue Time | 2026-08-10 / 08:00 AM | Valid Up to / Permit No. | 08:00 AM / [ CW_PERMIT_NO ] A/B |
| SECTION 2: COMPLIANCE MATRIX | ||||
| CHECK / CRITERIA | YES | NO | N/A | REMARKS |
| WORK AREA PREPARATION | ||||
| 1. Pre-job Meeting done? | ☑ |
[ Q1_RMK ] | ||
| 2. Gas Monitoring Required? | ☑ |
[ Q2_RMK ] | ||
| 3. Is there confined space areas? | ☑ |
[ Q3_RMK ] | ||
| 4. Is ventilation to the area adequate? | ☑ |
[ Q4_RMK ] | ||
| 5. Are lighting & access adequate? | ☑ |
[ Q5_RMK ] | ||
| 6. Emergency escape route marked? | ☑ |
[ Q6_RMK ] | ||
| 7. No hot work allowed in nearby area? | ☑ |
[ Q15_RMK ] | ||
| EQUIPMENT & INFRASTRUCTURE | ||||
| 8. Firefighting equipment available? | ☑ |
[ Q7_RMK ] | ||
| 9. Oil Spill kit available before opening pipeline? | ☑ |
[ Q8_RMK ] | ||
| 10. Trolley available for material handling? | ☑ |
[ Q12_RMK ] | ||
| 11. Availability of Healthy tools? | ☑ |
[ Q13_RMK ] | ||
| 12. Inspection of chain block/rope? | ☑ |
[ Q16_RMK ] | ||
| 13. Inspection of safety harness? | ☑ |
[ Q17_RMK ] | ||
| PERSONNEL & AUTHORIZATION | ||||
| 14. Permit for CS entry received from competent person? | ☑ |
[ Q9_RMK ] | ||
| 15. Trained worker? | ☑ |
[ Q10_RMK ] | ||
| 16. Are the workers in proper PPE? | ☑ |
[ Q11_RMK ] | ||
| 17. Barricade and proper signage displayed? | ☑ |
[ Q14_RMK ] | ||
| SECTION 3: PPE + SECTION 4: EMERGENCY READINESS | ||||
☑ S.C.B.A set |
☑ E.E.B.D |
☑ First Aid Box |
☑ Safety Helmet |
☑ Multi-gas meter |
☑ Cotton gloves |
☑ Ear plug |
☑ Safety Harness |
☑ Wet Gel Blanket |
☑ Fire Hose Standby |
☑ Oil Spill kit |
☑ Safety Shoes |
☑ Fire Extinguisher |
☑ Fire pump ready |
☑ Ladder |
| SECTION 7: JOINT INSPECTION & AUTHORISATION MATRIX | ||
| A. PERMIT APPLICANT | B. HSE APPROVAL | C. PERMIT CONTROLLER / PM-GM |
|
I am satisfied that all precaution has been taken and all safety arrangements will be maintained for entire duration of work.
Name: VISHAL PANDEY
Designation: Ship / Yard Supervisor Signature: |
I am satisfied with safety precautions and hereby give permission to commence work.
Name: VISHAL PANDEY
Designation: Safety Officer / HSE Manager Signature: |
Approval by Plot Manager (PM) / General Manager (GM).
Name: VISHAL PANDEY
Designation: PM/GM Signature: |
| SECTION 6: SPECIAL INSTRUCTIONS / ACKNOWLEDGEMENT |
|
GENERAL COLD WORK: 1. Never try to suppress a near miss; report it to HSE Manager. 2. Before opening pipelines/machinery, verify tools and status. 3. Hot work is strictly prohibited on pipelines under this permit. LIQUID OXYGEN (LOX) SPECIFIC: 4. Maintain exclusion zone; declare NO SMOKING / NO HOT WORK. 5. Do not use oil/grease on LOX connections. 6. Monitor tank pressure (PG-1); do not exceed 15 kg/cm².
I have read and understood all instructions above and have explained them to all workers engaged in the work.
Mukadam Signature: _____________________ Date: 2026-08-10 |
| SECTION 7: PERMIT RETURN | |||||
| ✓/X | STATUS | PERSON | NAME | SIGNATURE | TIME |
☑ |
Permit is closed, job is completed | Mukadam | VISHAL PANDEY | 08:00 AM | |
| Safety Officer | VISHAL PANDEY | ||||
| SECTION 10: EMERGENCY CONTACT NUMBERS | |||
| SL. NO. | DESIGNATION | NAME | CONTACT NO. |
| 1 | HSE MANAGER | ROCKY SINGH | 7990404108 |
| 2 | PLOT MANAGER | PRAVIN SHIYAL | 79846 07070 |