Logo
ALANGHSE SERVICES
VESSEL PULLING PERMIT ALANGHSE-F-06
REV. 01
Controlled Form
SECTION 1: REQUISITION / CONTROL INFORMATION
Date / Issue Time2026-08-10 / 08:00 AM Valid up to / Permit No.08:00 AM / [ VP_PERMIT_NO ] A/B
Applicant (Mukadam)VISHAL PANDEY Ship NameVISHAL PANDEY
Name of WorkersVISHAL PANDEY
Winch numbers (pulling)[ VP_WINCH_NOS ] JHA Report No.[ VP_JHA_NO ]
SECTION 2: COMPLIANCE MATRIX
CHECK / CRITERIAYESNON/AREMARKS
PLANNING & ENVIRONMENT
1. Vessel pulling plan discussed 1-day in advance?
[ Q1_RMK ]
2. Tide-tables available with Mukadam, winch operator and HSE?
[ Q2_RMK ]
3. Has the good weather prediction checked?
[ Q3_RMK ]
4. In case of low light, sufficient lights arranged?
[ Q4_RMK ]
5. “Safety Notification Form” to neighbouring yards given?
[ Q10_RMK ]
6. Pre-job Meeting done before pulling operation?
[ Q12_RMK ]
7. Outdoor illumination >= 60 lux in low light condition?
[ Q23_RMK ]
EQUIPMENT & WINCH OPERATION
8. Winches, Wire ropes, kappa & chains in good condition?
[ Q8_RMK ]
9. PM inspection for winches, wire ropes and kappa carried out?
[ Q9_RMK ]
10. Is winch operation and RPM meter tested prior to pulling?
[ Q14_RMK ]
11. Is the winch area door locked?
[ Q15_RMK ]
12. Is any oil leakage visible near winches?
[ Q16_RMK ]
13. Both sides of vessel connected with sheave blocks/chains?
[ Q22_RMK ]
SITE CLEARANCE & SAFETY CONTROLS
14. “Emergency signal to stop” explained to winch operators?
[ Q5_RMK ]
15. Primary & secondary comms agreed and tested?
[ Q6_RMK ]
16. HSE team member and supervisor clearly identified?
[ Q7_RMK ]
17. Are double bottom block lightening holes/manholes sealed?
[ Q11_RMK ]
18. Is the intertidal zone kept clear of any obstacles?
[ Q17_RMK ]
19. Are only designated competent persons operating winch?
[ Q18_RMK ]
20. Area clear and all ongoing work stopped on-board/inter-tidal?
[ Q19_RMK ]
21. All workers briefed on rules, emergency signals, and safety?
[ Q20_RMK ]
22. Barricaded area near winches & "Danger" signs displayed?
[ Q21_RMK ]
23. Is yard Management Representative present onsite?
[ Q24_RMK ]
24. Are all personnel wearing appropriate PPE?
[ Q13_RMK ]
SECTION 3: PPE + SECTION 4: EMERGENCY READINESS
Life jacket
Fire Extinguisher
First Aid Box
Safety Helmet
Safety Goggles
Cut resist gloves
Safety Shoes
Fire Hose
Life buoy
Fire pump ready
Cotton gloves
Ear plug
Sand bucket
Stretcher
Other/अन्य
Ear muff
Coveralls
SECTION 7: JOINT INSPECTION & AUTHORISATION MATRIX
A. PERMIT APPLICANT B. HSE APPROVAL C. PERMIT CONTROLLER / PM-GM
I am satisfied that all precaution has been taken and all safety arrangements will be maintained for entire duration of work.
Name: VISHAL PANDEY
Designation: Ship / Yard Supervisor
Signature:
I am satisfied with safety precautions and hereby give permission to commence work.
Name: VISHAL PANDEY
Designation: Safety Officer / HSE Manager
Signature:
Approval by Plot Manager (PM) / General Manager (GM).
Name: VISHAL PANDEY
Designation: PM/GM
Signature:
SECTION 6: SPECIAL INSTRUCTIONS / ACKNOWLEDGEMENT
1. नियर मिस कभी भी छुपाने की कोसिस न करे, उसे फौरन सेफ्टी ऑफिसर/HSE प्रबंधकको रिपोर्ट करे
2. काम समाप्त होने के तुरंत बाद परमिट सेफ्टीऑफ़िसर/HSE प्रबंधक को लौटा दे!
3. परमिट मे जिस स्थान और जहाज की परमिट दी गयी है उसके अलावा किसी अन्य जगह पर काम न करे

I have read and understood all instructions above and have explained them to all workers engaged in the work.

Mukadam Signature: _____________________     Date: 2026-08-10
SECTION 7: PERMIT RETURN
✓/XSTATUSPERSONNAMESIGNATURETIME
Permit is closed, job is completed MukadamVISHAL PANDEY 08:00 AM
Safety OfficerVISHAL PANDEY
SECTION 10: EMERGENCY CONTACT NUMBERS
SL. NO.DESIGNATIONNAMECONTACT NO.
1 HSE MANAGER ROCKY SINGH 7990404108
2 PLOT MANAGER PRAVIN SHIYAL 79846 07070