WORK AT HEIGHT PERMIT ALANGHSE-WAH-03
REV. 01
Controlled Form
SECTION 1: REQUISITION / CONTROL INFORMATION
Applicant (Mukadam)VISHAL PANDEY Ship NameVISHAL PANDEY
Location / Work Description[ WAH_LOC_DESC ] - [ WAH_DESC ]
Workers / AttendantVISHAL PANDEY / [ WAH_ATTENDANT ]
Date / Issue Time2026-08-10 / 08:00 AM Valid up to / Permit No.[ WAH_VALID ] / [ WAH_PERMIT_NO ] A/B
SECTION 2: COMPLIANCE MATRIX
CHECK / CRITERIAYESNON/AREMARKS
ENVIRONMENT & PREPARATION
1. Pre-job Meeting done
[ Q1_RMK ]
2. Gas Monitoring Required
[ Q2_RMK ]
3. Is there confined space areas?
[ Q3_RMK ]
4. Is ventilation to the area adequate?
[ Q4_RMK ]
5. Are lighting & access to the work area adequate?
[ Q5_RMK ]
6. Barricade and proper signage displayed?
[ Q6_RMK ]
7. Emergency escape route is marked & unobstructed?
[ Q9_RMK ]
FALL PROTECTION & EQUIPMENT
8. Availability of ladder in good condition?
[ Q7_RMK ]
9. Are ladder, safety harness and fall arrestor inspected and tagged?
[ Q8_RMK ]
10. Are all tools, secured by lanyard/bag/belt?
[ Q10_RMK ]
11. Safety harness and fall arrestor attached to strong anchor point?
[ Q11_RMK ]
PERSONNEL & SUPERVISION
12. Person available at standby
[ Q12_RMK ]
13. Worker in proper PPE
[ Q13_RMK ]
14. Trained worker?
[ Q14_RMK ]
SECTION 3: PPE + SECTION 4: EMERGENCY READINESS
S.C.B.A set
E.E.B.D
First Aid Box
Safety Helmet
Safety Goggles
Safety Shoes
Cotton gloves
Safety Harness
Tripod
Fire Hose Standby
Ear plug
Coveralls
Fire Extinguisher
Fire pump ready
Fall Arrestor
SECTION 7: JOINT INSPECTION & AUTHORISATION MATRIX
A. PERMIT APPLICANT B. HSE APPROVAL C. PERMIT CONTROLLER / PM-GM
I am satisfied that all precaution has been taken and all safety arrangements will be maintained for entire duration of work.
Name: VISHAL PANDEY
Designation: Ship / Yard Supervisor
Signature:
I am satisfied with safety precautions and hereby give permission to commence work.
Name: VISHAL PANDEY
Designation: Safety Officer / HSE Manager
Signature:
Approval by Plot Manager (PM) / General Manager (GM).
Name: VISHAL PANDEY
Designation: PM/GM
Signature:
SECTION 5: SPECIAL INSTRUCTIONS / ACKNOWLEDGEMENT
1. 100% Tie-off is mandatory. Always hook lanyard to a rigid structure, never to scaffolding pipe you are standing on.
2. Do not throw materials or tools from height. Ensure drop-zones are barricaded below.
3. Halt work immediately in case of heavy rain, lightning, or high wind.
4. Work at height is to be stopped, when wind speed is ≥ 35 km/hr. (ref: HSE, UK).

I have read and understood all instructions above and have explained them to all workers engaged in the work.

Mukadam Signature: _____________________     Date: 2026-08-10
SECTION 6: PERMIT RETURN
✓/XSTATUSPERSONNAMESIGNATURETIME
Permit is closed, job is completed MukadamVISHAL PANDEY 08:00 AM
Safety OfficerVISHAL PANDEY
SECTION 10: EMERGENCY CONTACT NUMBERS
SL. NO.DESIGNATIONNAMECONTACT NO.
1 HSE MANAGER ROCKY SINGH 7990404108
2 PLOT MANAGER PRAVIN SHIYAL 79846 07070