Logo
ALANGHSE SERVICES
DE-BUNKERING PERMIT ALANGHSE-F-05
REV. 01
Controlled Form
STEP 1: REQUISITION PERMIT IDENTIFICATION
Applicant (Mukadam)VISHAL PANDEY Ship NameVISHAL PANDEY
Location / Work Description[ DB_LOCATION ] - [ DB_DESC ]
Workers / Sub. ContractorVISHAL PANDEY / [ DB_SUB_CONTRACTOR ] ([ DB_SUB_CONTACT ])
Date / Issue Time2026-08-10 / 08:00 AM Valid Up to / Permit No.08:00 AM / [ DB_PERMIT_NO ] A/B
STEP 2: ASSOCIATED PERMITS
Confined space permit
Safe for Entry (Vessel)
Work at height permit
Other: [ DB_AP_OTHER ]
STEP 3: PRE-WORK SAFETY VERIFICATION
CRITERIA Y N N/A CRITERIA Y N N/A
1. Is work permit for oil removal received from external competent authority?
16. Inspection of pipelines for damages/Joints/leaks done?
2. Is the vessel securely moored?
17. Have drip trays been provided under joints?
3. Job Hazard Assessment, if any?
18. Is there continuous supervision at inlet/outlet points?
4. Availability of First Aid Kit and Oil Spill kit?
19. Have Oil tray placed below the pump with oil boom?
5. Is oil boom wrap around hose intact?
20. Procedure for emergency shutdown and contact number in place?
6. Gas Monitoring Required?
21. Has connection to the tank been properly secured and sealed?
7. Is oil removal pump kept in confined space area?
22. Is the oil removal team trained?
8. Is ventilation to the area adequate?
23. Are the workers in proper PPE?
9. Are lighting and access/escape route adequate?
24. Availability of equipment in good condition?
10. Housekeeping maintained and flammable materials removed?
25. Proper signage for warning/caution displayed?
11. Fire fighting equipment available with fire team?
26. No hot work allowed in nearby area?
12. Is portable fire extinguisher at pumping/filling station?
27. The Emergency Assembly Point identified?
13. Has the method and clarity of communication been established?
28. Pre-job Meeting done?
14. Inspection of all equipment’s including pumps done?
29. Induction training provided to oil removal truck drivers?
15. Are electric cables proper insulated?
30. Is oil loading area barricaded and stoppers provided for trucks?
STEP 4: PPE / EMERGENCY READINESS
Safety Helmet
Dust mask
S.C.B.A set
E.E.B.D
Coveralls
Cotton gloves
Stretcher
Fire suit
Harness (truck)
Latex gloves
Fire Blanket
First Aid Box
Filter mask
Safety Goggles
Fire Extinguisher
Fire Hose
Ear plug
Disposal suit
Sand bucket
Wet Gel Blanket
Safety Harness
Mech. Blowers
Ladder
Rope
STEP 5: JOINT INSPECTION / AUTHORISATION
PERMIT APPLICANT
I am satisfied that all precaution has been taken and all safety arrangements will be maintained for entire duration of work.
Name: VISHAL PANDEY
Designation: Ship / Yard Supervisor
Signature:
APPROVAL BY HSE DEPARTMENT
I am satisfied with safety precautions and hereby give permission to commence work.
Name: VISHAL PANDEY
Designation: Safety Officer / HSE Manager
Signature:
PERMIT CONTROLLER / PM-GM
Approval by Plot Manager (PM) / General Manager (GM).
Name: VISHAL PANDEY
Designation: PM/GM
Signature:
STEP 6: SPECIAL INSTRUCTIONS / MUKADAM ACKNOWLEDGEMENT
1. अगर कहीं भी DO NOT ENTER लिखा हुआ हो तो कभी भी अन्दर न जाये और नाही किसी को जाने दे जब तक आपके पास परमिट न हो|
2. नियर मिस कभी भी छुपाने की कोसिस न करे उसे फौरन सेफ्टी ऑफिसर को रिपोर्ट करे |
3. पाइपलाइन/मसिनेरी पार्ट्स खोलने से पहले अपने टूल्स और अन्य वास्तु को चेक करना जरुरी है |
4. अगर आपको डी बंकरिंग परमिट मिल गया है और कहीं बंद जगहे में काम करना हो तो बंदस्थान की अलग से अनुमति लेना आनिवार्य है|
5. किसी भी टैंक की सफाई करने से पहले बंदस्थान की अनुमति परमिट लेना आनिवार्य है |

Mukadam acknowledgement: I have read, understood and explained these instructions to all workers.
Signature: _____________________     Date: 2026-08-10
STEP 7: PERMIT RETURN
✓/XSTATUSPERSONNAMESIGNATURETIME
Permit is closed, job is completed MukadamVISHAL PANDEY 08:00 AM
Safety OfficerVISHAL PANDEY
SECTION 10: EMERGENCY CONTACT NUMBERS
SL. NO.DESIGNATIONNAMECONTACT NO.
1 HSE MANAGER ROCKY SINGH 7990404108
2 PLOT MANAGER PRAVIN SHIYAL 79846 07070