Logo
ALANGHSE SERVICES
SAFE FOR ENTRY PERMIT ALANGHSE-SFE-01
REV. 01
Controlled Form
STEP 1: REQUISITION PERMIT IDENTIFICATION
Ship NameVISHAL PANDEY Time of Check08:00 AM
Date / Issue Time2026-08-10 / 08:00 AM Valid till / Permit No.[ SE_VALID_TILL ] / [ SE_PERMIT_NO ] A/B
JHA Report No.[ SE_JHA ] Ext. Competent Person Permit No.[ SE_EXT_PERMIT ]
STEP 2: GAS READINGS & EQUIPMENT STEP 3: LOCATION FOR SAFE ENTRY
O2[ GAS_O2 ]
LEL[ GAS_LEL ]
CO[ GAS_CO ]
H2S[ GAS_H2S ]
Forepeak tank
Engine room
Upper/main deck
Void Space no. ☑
Meter: MSA ALTAIR 4X / GMI PS 241 Other/Blocks: ☑ ☑
STEP 4: PRE-WORK SAFETY VERIFICATION
CRITERIA Y N N/A CRITERIA Y N N/A
1. Safe for Entry Tag/board displayed near ladders.
9. Valid certificates of access ladders are displayed.
2. Marking of assembly area & escape route.
10. Emergency response team members contact displayed.
3. Access is restricted and barricaded if not safe.
11. Availability of emergency items near assembly area.
4. Illumination >= 60 lux.
12. Wind speed <=35 km/hr.
5. Temperature <= 45°C.
13. Escape route free from obstacles.
6. Display of emergency contact near accesses.
14. Open edges are barricaded at least 1m away.
7. Temporary holes on floor are covered/barricaded.
15. Continuous power supply & backup available.
8. Head count system/worker tracking in place.
16. Temporary ladders are tied on both sides.
STEP 5: PPE / EMERGENCY READINESS
SCBA sets (04)
EEBD (04)
Fire Pumps (2)
Fire Hoses (>=200m)
Spare Safety Harness (>=4)
Fall Arrestor (1)
Tripod (1)
Emergency Siren (1)
Fire Blanket (1)
Sand Buckets (>=4)
First Aid Box (1)
Stretcher (1)
Pilot ladder (2)
Fire Suits (2)
Fire Extinguishers (>=4)
Life Buoys (>=5)
Life jackets (>=5)
Rope (>=20m)
Oil Spill Kit
Spare fire Nozzles (>=4)
STEP 5: JOINT INSPECTION / AUTHORISATION
PERMIT APPLICANT
I am satisfied that all precaution has been taken and all safety arrangements will be maintained for entire duration of work.
Name: VISHAL PANDEY
Designation: Ship / Yard Supervisor
Signature:
APPROVAL BY HSE DEPARTMENT
I am satisfied with safety precautions and hereby give permission to commence work.
Name: VISHAL PANDEY
Designation: Safety Officer / HSE Manager
Signature:
PERMIT CONTROLLER / PM-GM
Approval by Plot Manager (PM) / General Manager (GM).
Name: VISHAL PANDEY
Designation: PM/GM
Signature:
STEP 7: SPECIAL INSTRUCTIONS / MUKADAM ACKNOWLEDGEMENT
1. Safe for Entry Tag must be strictly obeyed. Do not enter without valid authorization.

2. Verify emergency escape routes are clear before commencing any work.

3. Maintain continuous tracking of personnel utilizing the Head Count System.
4. In case of mechanical system failure or general lighting system failure, the Safety Officer / HSE Manager shall be re-called, and the “Entry Permit” shall become void.

Mukadam acknowledgement: I have read, understood and explained these instructions to all workers.
Signature: _____________________     Date: 2026-08-10
STEP 8: PERMIT RETURN
✓/XSTATUSPERSONSIGNATURETIME
This Permit is closed and new safe for entry (ship) [ SE_NEW_PERMIT ] has been issued. Safety Officer 08:00 AM
This Permit is closed/cancelled and all the persons have dis-embarked form the ship. Safety Officer 08:00 AM
SECTION 10: EMERGENCY CONTACT NUMBERS
SL. NO.DESIGNATIONNAMECONTACT NO.
1 HSE MANAGER ROCKY SINGH 7990404108
2 PLOT MANAGER PRAVIN SHIYAL 79846 07070