WORK AT HEIGHT PERMIT ALANGHSE-WAH-03
REV. 01
Controlled Form
STEP 1: REQUISITION PERMIT IDENTIFICATION
Applicant (Mukadam)VISHAL PANDEY Ship NameVISHAL PANDEY
Location / Work Description[ WAH_LOC_DESC ] - [ WAH_DESC ]
Workers / AttendantVISHAL PANDEY / [ WAH_ATTENDANT ]
Date / Issue Time2026-08-10 / 08:00 AM Valid up to / Permit No.[ WAH_VALID ] / [ WAH_PERMIT_NO ] A/B
STEP 2: ASSOCIATED PERMITS
Confined space permit
Cold work permit
Hot work permit
Safe for entry
STEP 3: PRE-WORK SAFETY VERIFICATION
CRITERIA Y N N/A CRITERIA Y N N/A
1. Pre-job Meeting done
8. Are ladder, safety harness and fall arrestor inspected and tagged?
2. Gas Monitoring Required
9. Emergency escape route is marked & unobstructed?
3. Is there confined space areas?
10. Are all tools, secured by lanyard/bag/belt?
4. Is ventilation to the area adequate?
11. Safety harness and fall arrestor attached to strong anchor point?
5. Are lighting & access to the work area adequate?
12. Person available at standby
6. Barricade and proper signage displayed?
13. Worker in proper PPE
7. Availability of ladder in good condition?
14. Trained worker?
STEP 4: PPE / EMERGENCY READINESS
S.C.B.A set
E.E.B.D
First Aid Box
Safety Helmet
Safety Goggles
Safety Shoes
Cotton gloves
Safety Harness
Tripod
Fire Hose Standby
Ear plug
Coveralls
Fire Extinguisher
Fire pump ready
Fall Arrestor
Dust mask
Life Jacket
Sand buckets
Stretcher
Fire Blanket
STEP 5: JOINT INSPECTION / AUTHORISATION
PERMIT APPLICANT
I am satisfied that all precaution has been taken and all safety arrangements will be maintained for entire duration of work.
Name: VISHAL PANDEY
Designation: Ship / Yard Supervisor
Signature:
APPROVAL BY HSE DEPARTMENT
I am satisfied with safety precautions and hereby give permission to commence work.
Name: VISHAL PANDEY
Designation: Safety Officer / HSE Manager
Signature:
PERMIT CONTROLLER / PM-GM
Approval by Plot Manager (PM) / General Manager (GM).
Name: VISHAL PANDEY
Designation: PM/GM
Signature:
STEP 6: SPECIAL INSTRUCTIONS / MUKADAM ACKNOWLEDGEMENT
1. 100% Tie-off is mandatory. Always hook lanyard to a rigid structure, never to scaffolding pipe you are standing on.

2. Do not throw materials or tools from height. Ensure drop-zones are barricaded below.
3. Halt work immediately in case of heavy rain, lightning, or high wind.

Mukadam acknowledgement: I have read, understood and explained these instructions to all workers.
Signature: _____________________     Date: 2026-08-10
STEP 7: PERMIT RETURN
✓/XSTATUSPERSONNAMESIGNATURETIME
Permit is closed, job is completed MukadamVISHAL PANDEY 08:00 AM
Safety OfficerVISHAL PANDEY
SECTION 10: EMERGENCY CONTACT NUMBERS
SL. NO.DESIGNATIONNAMECONTACT NO.
1 HSE MANAGER ROCKY SINGH 7990404108
2 PLOT MANAGER PRAVIN SHIYAL 79846 07070